Point Beach nuclear power plant
Point Beach nuclear power plant is a nuclear power station in United States with 2 operating units totalling 1,280 MW gross. The site has 2 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | WH 2LP (DRYAMB) | 640 | 1970 | |
| Unit 2 | PWR | WH 2LP (DRYAMB) | 640 | 1972 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Point Beach nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 2-loop |
| Size class | Large |
| Gross capacity | 640MW |
| Net capacity | 591MW |
| Thermal output | 1,800MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Nextera Energy Resources LLC100% |
| Operator | Nextera Energy Resources |
| Construction start | 19 Jul 1967 |
|---|---|
| First criticality | 2 Nov 1970 |
| Grid connection | 6 Nov 1970 |
| Commercial operation | 21 Dec 1970 |
Live status, outage record and fuel chain for Point Beach nuclear power plant 1
Point Beach nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 2-loop |
| Size class | Large |
| Gross capacity | 640MW |
| Net capacity | 591MW |
| Thermal output | 1,800MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Nextera Energy Resources LLC100% |
| Operator | Nextera Energy Resources |
| Construction start | 25 Jul 1968 |
|---|---|
| First criticality | 30 May 1972 |
| Grid connection | 2 Aug 1972 |
| Commercial operation | 1 Oct 1972 |
Live status, outage record and fuel chain for Point Beach nuclear power plant 2
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 2 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
United States runs 63 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. Westinghouse Electric Company is based in United States.Country exposure
Point Beach nuclear power plant in context
By gross operating capacity Point Beach nuclear power plant is the 38th largest of 54 operating nuclear sites in the United States, holding 1% of the country's operating capacity, and ranks 126th of 172 worldwide.
Its operating units started up between 1970 and 1972; the median unit is 55.0 years old, older than the median of 45.0 in the United States.
The 2 units with both construction and grid dates on record took 3.3 to 4.0 years (median 3.7) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.
The nearest other tracked nuclear sites are Palisades nuclear power plant (239 km), Donald C Cook nuclear power plant (268 km) and Byron nuclear power plant (283 km).
The USGS catalogue holds no earthquake of magnitude 5 or more within 100 km of the site between 1975 and 2025.
2 operating units are rated differently now from their design net capacities: Unit 1 +18.9% and Unit 2 +18.9%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1967 | 1970 | 3.3 | 5.4 (1970s) |
| Unit 2 | 1968 | 1972 | 4.0 | 5.4 (1970s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Palisades nuclear power plant | United States | 239 km | - |
| Donald C Cook nuclear power plant | United States | 268 km | 2.4 |
| Byron nuclear power plant | United States | 283 km | 2.5 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. Earthquake counts are from the USGS catalogue, as on the earthquake history page. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Point Beach nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Wisconsin, United States |
|---|---|
| Coordinates | 44.2806, -87.5369 |
| Elevation | about 195 mabove sea level |
| Setting | On the shore of a large lake, 0.5 km from the water |
| Region | Northern America |
| Units by status | Operating: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Nextera Energy Resources LLC |
|---|---|
| Operators | Nextera Energy Resources |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data