Kursk nuclear power plant
Kursk nuclear power plant is a nuclear power station in Russia with 3 operating units totalling 3,255 MW gross. The site has 9 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1-3 | LWGR | RBMK-1000 | 1,000 | 1984 | |
| Unit 1-4 | LWGR | RBMK-1000 | 1,000 | 1986 | |
| Unit 2-1 | PWR | VVER V-510 | 1,255 | 2026 | |
| Unit 2-2 | Under construction | PWR | VVER V-510 | 1,255 | - |
| Unit 2-3 | Under construction | PWR | VVER-TOI | 1,255 | 2034 |
| Unit 1-1 | Retired | LWGR | RBMK-1000 | 1,000 | 1977 |
| Unit 1-2 | Retired | LWGR | RBMK-1000 | 1,000 | 1979 |
| Unit 1-5 | Cancelled | LWGR | RBMK-1000 | 1,100 | - |
| Unit 2-4 | Pre-construction | PWR | VVER-TOI | 1,255 | 2034 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Kursk nuclear power plant 1-3
| Reactor type | Light water graphite reactor (LWGR) |
|---|---|
| Model | RBMK-1000 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 925MW |
| Thermal output | 3,200MWt |
| Enrichment | 2–2.6% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Apr 1978 |
|---|---|
| First criticality | 9 Aug 1983 |
| Grid connection | 17 Oct 1983 |
| Commercial operation | 30 Mar 1984 |
Kursk nuclear power plant 1-4
| Reactor type | Light water graphite reactor (LWGR) |
|---|---|
| Model | RBMK-1000 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 925MW |
| Thermal output | 3,200MWt |
| Enrichment | 2–2.6% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 May 1981 |
|---|---|
| First criticality | 31 Oct 1985 |
| Grid connection | 2 Dec 1985 |
| Commercial operation | 5 Feb 1986 |
Kursk nuclear power plant 2-1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-510 |
| Size class | Large |
| Gross capacity | 1,255MW |
| Net capacity | 1,200MW |
| Thermal output | 3,300MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 28 Apr 2018 |
|---|---|
| First criticality | 22 May 2025 |
| Grid connection | 31 Dec 2025 |
| Commercial operation | 1 May 2026 |
Kursk nuclear power plant 2-2 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-510 |
| Size class | Large |
| Gross capacity | 1,255MW |
| Net capacity | 1,200MW |
| Thermal output | 3,300MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 May 2019 |
|---|
Kursk nuclear power plant 2-3 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-TOI |
| Size class | Large |
| Gross capacity | 1,255MW |
| Net capacity | 1,200MW |
| Thermal output | 3,300MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 20 Dec 2025 |
|---|---|
| Commercial operation | 1 Jan 2034 |
Kursk nuclear power plant 1-1 Retired
| Reactor type | Light water graphite reactor (LWGR) |
|---|---|
| Model | RBMK-1000 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 925MW |
| Thermal output | 3,200MWt |
| Enrichment | 2–2.6% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Jun 1972 |
|---|---|
| First criticality | 25 Oct 1976 |
| Grid connection | 19 Dec 1976 |
| Commercial operation | 12 Oct 1977 |
| Permanent shutdown | 19 Dec 2021 |
Kursk nuclear power plant 1-2 Retired
| Reactor type | Light water graphite reactor (LWGR) |
|---|---|
| Model | RBMK-1000 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 925MW |
| Thermal output | 3,200MWt |
| Enrichment | 2–2.6% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Jan 1973 |
|---|---|
| First criticality | 16 Dec 1978 |
| Grid connection | 28 Jan 1979 |
| Commercial operation | 17 Aug 1979 |
| Permanent shutdown | 31 Jan 2024 |
Kursk nuclear power plant 1-5 Cancelled
| Reactor type | Light water graphite reactor (LWGR) |
|---|---|
| Model | RBMK-1000 |
| Size class | Large |
| Gross capacity | 1,100MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 2–2.6% U-235 |
| NSSS vendor | Rosatom |
| Cancelled | 2012 |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Dec 1985 |
|---|
Kursk nuclear power plant 2-4 Pre-construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-TOI |
| Size class | Large |
| Gross capacity | 1,255MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Commercial operation | 1 Jan 2034 |
|---|
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| RBMK fuel | 2 | TVEL Fuel Company | Enriched |
| VVER (hexagonal) fuel | 3 | TVEL Fuel Company, Westinghouse Electric Company | Enriched |
Russia runs 7 operating units on RBMK fuel. 1 fabricator is documented for it. TVEL Fuel Company is based in Russia. Every documented supplier is in Russia.Country exposure
Russia runs 23 operating units on VVER (hexagonal) fuel. 2 fabricators are documented for it. TVEL Fuel Company is based in Russia.Country exposure
Kursk nuclear power plant in context
By gross operating capacity Kursk nuclear power plant is the 6th largest of 10 operating nuclear sites in Russia, holding 11% of the country's operating capacity, and ranks 37th of 172 worldwide.
Its operating units started up between 1984 and 2026; the median unit is 40.0 years old, older than the median of 37.5 in Russia.
The 5 units with both construction and grid dates on record took 4.6 to 7.7 years (median 5.5) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.
The nearest other tracked nuclear sites are Novovoronezh nuclear power plant (254 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1-1 | 1972 | 1976 | 4.6 | 5.4 (1970s) |
| Unit 1-2 | 1973 | 1979 | 6.1 | 5.4 (1970s) |
| Unit 1-3 | 1978 | 1983 | 5.5 | 7.3 (1980s) |
| Unit 1-4 | 1981 | 1985 | 4.6 | 7.3 (1980s) |
| Unit 2-1 | 2018 | 2025 | 7.7 | 7.7 (2020s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Novovoronezh nuclear power plant | Russia | 254 km | 3.8 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Kursk nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Kursk, Russia |
|---|---|
| Coordinates | 51.6764, 35.6064 |
| Elevation | about 170 mabove sea level |
| Setting | About 530 km from the sea |
| Region | Eastern Europe |
| Units by status | Operating: 3 Under construction: 2 Retired: 2 Cancelled: 1 Pre-construction: 1 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Rosatom |
|---|---|
| Operators | Rosenergoatom |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data