Hongyanhe nuclear power plant
Hongyanhe nuclear power plant is a nuclear power station in China with 6 operating units totalling 6,714 MW gross. The site has 6 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1-1 | PWR | CPR-1000 | 1,119 | 2013 | |
| Unit 1-2 | PWR | CPR-1000 | 1,119 | 2014 | |
| Unit 1-3 | PWR | CPR-1000 | 1,119 | 2015 | |
| Unit 1-4 | PWR | CPR-1000 | 1,119 | 2016 | |
| Unit 2-5 | PWR | ACPR-1000 | 1,119 | 2021 | |
| Unit 2-6 | PWR | ACPR-1000 | 1,119 | 2022 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Hongyanhe nuclear power plant 1-1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,119MW |
| Net capacity | 1,061MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | CGNPC Nuclear Power Investment Co Ltd100% |
| Operator | Liaoning Hongyanhe Nuclear Power |
| Construction start | 18 Aug 2007 |
|---|---|
| First criticality | 16 Jan 2013 |
| Grid connection | 17 Feb 2013 |
| Commercial operation | 6 Jun 2013 |
Hongyanhe nuclear power plant 1-2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,119MW |
| Net capacity | 1,061MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | CGNPC Nuclear Power Investment Co Ltd100% |
| Operator | Liaoning Hongyanhe Nuclear Power |
| Construction start | 28 Mar 2008 |
|---|---|
| First criticality | 24 Oct 2013 |
| Grid connection | 23 Nov 2013 |
| Commercial operation | 13 May 2014 |
Hongyanhe nuclear power plant 1-3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,119MW |
| Net capacity | 1,061MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | CGNPC Nuclear Power Investment Co Ltd100% |
| Operator | Liaoning Hongyanhe Nuclear Power |
| Construction start | 7 Mar 2009 |
|---|---|
| First criticality | 27 Oct 2014 |
| Grid connection | 23 Mar 2015 |
| Commercial operation | 16 Aug 2015 |
Hongyanhe nuclear power plant 1-4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,119MW |
| Net capacity | 1,061MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | CGNPC Nuclear Power Investment Co Ltd100% |
| Operator | Liaoning Hongyanhe Nuclear Power |
| Construction start | 15 Aug 2009 |
|---|---|
| First criticality | 5 Mar 2016 |
| Grid connection | 1 Apr 2016 |
| Commercial operation | 8 Jun 2016 |
Hongyanhe nuclear power plant 2-5
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | ACPR-1000 |
| Size class | Large |
| Gross capacity | 1,119MW |
| Net capacity | 1,061MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | CGNPC Nuclear Power Investment Co Ltd100% |
| Operator | Liaoning Hongyanhe Nuclear Power |
| Construction start | 29 Mar 2015 |
|---|---|
| First criticality | 13 Jun 2021 |
| Grid connection | 25 Jun 2021 |
| Commercial operation | 31 Jul 2021 |
Hongyanhe nuclear power plant 2-6
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | ACPR-1000 |
| Size class | Large |
| Gross capacity | 1,119MW |
| Net capacity | 1,061MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | CGNPC Nuclear Power Investment Co Ltd100% |
| Operator | Liaoning Hongyanhe Nuclear Power |
| Construction start | 24 Jul 2015 |
|---|---|
| First criticality | 21 Apr 2022 |
| Grid connection | 2 May 2022 |
| Commercial operation | 23 Jun 2022 |
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 6 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
China runs 54 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. China National Nuclear Corporation is based in China.Country exposure
Hongyanhe nuclear power plant in context
By gross operating capacity Hongyanhe nuclear power plant is the 1st largest of 18 operating nuclear sites in China, holding 10% of the country's operating capacity, and ranks 2nd of 172 worldwide.
Its operating units started up between 2013 and 2022; the median unit is 10.5 years old, older than the median of 10.0 in China.
The 6 units with both construction and grid dates on record took 5.5 to 6.8 years (median 6.1) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
The nearest other tracked nuclear sites are Xudapu nuclear power plant (100 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1-1 | 2007 | 2013 | 5.5 | 5.9 (2010s) |
| Unit 1-2 | 2008 | 2013 | 5.7 | 5.9 (2010s) |
| Unit 1-3 | 2009 | 2015 | 6.0 | 5.9 (2010s) |
| Unit 1-4 | 2009 | 2016 | 6.6 | 5.9 (2010s) |
| Unit 2-5 | 2015 | 2021 | 6.2 | 7.7 (2020s) |
| Unit 2-6 | 2015 | 2022 | 6.8 | 7.7 (2020s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Xudapu nuclear power plant | China | 100 km | - |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Hongyanhe nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Hongyanhe, Liaoning, China |
|---|---|
| Coordinates | 39.7964, 121.4774 |
| Elevation | about 10 mabove sea level |
| Setting | On the sea coast, 0.3 km from the water |
| Region | Eastern Asia |
| Units by status | Operating: 6 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | CGNPC Nuclear Power Investment Co Ltd |
|---|---|
| Operators | Liaoning Hongyanhe Nuclear Power |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data