Akademik Lomonosov nuclear power plant
Akademik Lomonosov nuclear power plant is a nuclear power station in Russia with 2 operating units totalling 70 MW gross. The site has 2 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | KLT-40S 'Floating' | 35 | 2020 | |
| Unit 2 | PWR | KLT-40S 'Floating' | 35 | 2020 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Akademik Lomonosov nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | KLT-40S 'Floating' |
| Size class | Small |
| Gross capacity | 35MW |
| Net capacity | 32MW |
| Thermal output | 150MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | not on record |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 15 Apr 2007 |
|---|---|
| First criticality | 2 Nov 2018 |
| Grid connection | 19 Dec 2019 |
| Commercial operation | 22 May 2020 |
Akademik Lomonosov nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | KLT-40S 'Floating' |
| Size class | Small |
| Gross capacity | 35MW |
| Net capacity | 32MW |
| Thermal output | 150MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | not on record |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 15 Apr 2007 |
|---|---|
| First criticality | 8 Nov 2018 |
| Grid connection | 19 Dec 2019 |
| Commercial operation | 22 May 2020 |
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 2 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
Russia runs 2 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. No documented fabricator is based in Russia.Country exposure
Akademik Lomonosov nuclear power plant in context
By gross operating capacity Akademik Lomonosov nuclear power plant is the 10th largest of 10 operating nuclear sites in Russia, holding 0% of the country's operating capacity, and ranks 171st of 172 worldwide.
Its operating units started up in 2020; the median unit is 6.0 years old, younger than the median of 37.5 in Russia.
The 2 units with both construction and grid dates on record took 12.7 to 12.7 years (median 12.7) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
No other nuclear site with an exact position in this dataset lies within 300 km.
2 operating units are rated differently now from their design net capacities: Unit 1 +6.7% and Unit 2 +6.7%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 2007 | 2019 | 12.7 | 5.9 (2010s) |
| Unit 2 | 2007 | 2019 | 12.7 | 5.9 (2010s) |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Akademik Lomonosov nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Chukotka, Russia |
|---|---|
| Coordinates | 69.7086, 170.3011 |
| Elevation | about 0 mabove sea level |
| Setting | On the sea coast, 0.2 km from the water |
| Region | Eastern Europe |
| Units by status | Operating: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (ASTER GDEM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Rosatom |
|---|---|
| Operators | Rosenergoatom |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data