Sumatra nuclear power plant
Announced Indonesia
Gross capacity
250MW
Sumatra nuclear power plant is a nuclear unit at Sumatra nuclear power plant in Indonesia rated at 250 MW gross. It is announced. Commercial operation began 1 Jan 2032.
Specification
| Reactor type | not disclosed |
|---|---|
| Model | not disclosed |
| Size class | not disclosed |
| Coolant | not disclosed |
| Moderator | not disclosed |
| Gross capacity | 250MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| Typical enrichment | not disclosed |
Ownership & location
| Site | Sumatra nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Indonesia |
| Owner | PT PLN (Persero)100% |
| Coordinates | -0.2805, 101.5576approximate |
Fuel chain for this unit
Fuel form
not established for this unit's type
Enrichment
not established
Upstream
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 1 Jan 2032Commercial operation