Southern Ohio Diversification Initiative nuclear power plant 1
Southern Ohio Diversification Initiative nuclear power plant 1 is a fast reactor unit at Southern Ohio Diversification Initiative nuclear power plant in United States rated at 15 MW gross. It is pre-construction. Commercial operation began 1 Jan 2030.
| Reactor type | Fast reactor (FBR) |
|---|---|
| Model | Aurora |
| Size | Very small20 MWe or less |
| Coolant | Liquid sodium or lead |
| Moderator | None |
| Gross capacity | 15MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| NSSS vendor | Oklo Inc.all vendors |
| Typical enrichment | 15–20% fissile, or plutonium |
| Site | Southern Ohio Diversification Initiative nuclear power plant |
|---|---|
| Unit | 1 |
| Country | United States |
| Coordinates | 39.0128, -83.0007 |
- TVEL Fuel Company Fast reactor fuel, including MOX
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 Jan 2030Commercial operation
Other units at Southern Ohio Diversification Initiative nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Southern Ohio Diversification Initiative nuclear power plant 2 | Pre-construction | 15 |
Other Aurora units
7 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Aurora nuclear power plant 1 | United States | Pre-construction | 75 |
| Aurora nuclear power plant Microreactor | United States | Cancelled | 2 |
| Eielson Air Force Base nuclear power plant | United States | Pre-construction | 5 |
| Oklo nuclear power plant 1 | United States | Pre-construction | 75 |
| Oklo nuclear power plant 2 | United States | Pre-construction | 75 |
| Southern Ohio Diversification Initiative nuclear power plant 2 | United States | Pre-construction | 15 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-06-29
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data