Ruijin nuclear power plant 5
Ruijin nuclear power plant 5 is a high-temperature gas reactor unit at Ruijin nuclear power plant in China rated at 600 MW gross. It is cancelled (a status Global Energy Monitor inferred from an absence of observed progress).
| Reactor type | High-temperature gas reactor (HTGR) |
|---|---|
| Model | not disclosed |
| Size | Largeabove 300 MWe |
| Coolant | Helium |
| Moderator | Graphite |
| Gross capacity | 600MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| NSSS vendor | not on record |
| Typical enrichment | 8–20% U-235, frequently HALEU |
| Site | Ruijin nuclear power plant |
|---|---|
| Unit | 5 |
| Country | China |
| Owner | China National Nuclear Corp100% |
| Operator | China Nuclear High Temperature Reactor Holding |
| Coordinates | 25.8670, 115.9735approximate |
| Cancelled | 2021 |
- BWX Technologies TRISO particle fuel
- X-energy TRISO particle fuel, HALEU enrichment
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
This design needs HALEU, enrichment above 5%. Western production is currently measured in hundreds of kilograms a year.
Other units at Ruijin nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Ruijin nuclear power plant 1-1 | Cancelled | 600 |
| Ruijin nuclear power plant 1-2 | Cancelled | 600 |
| Ruijin nuclear power plant 3 | Cancelled | 600 |
| Ruijin nuclear power plant 4 | Cancelled | 600 |
| Ruijin nuclear power plant 6 | Cancelled | 600 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-07
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data