Fort St. Vrain nuclear power plant
Fort St. Vrain nuclear power plant is a high-temperature gas reactor unit at Fort St. Vrain nuclear power plant in United States rated at 342 MW gross. It is retired. Commercial operation began 1 Jul 1979.
| Reactor type | High-temperature gas reactor (HTGR) |
|---|---|
| Model | not disclosed |
| Size | Largeabove 300 MWe |
| Coolant | Helium |
| Moderator | Graphite |
| Gross capacity | 342MW |
| Net capacity (reference) | 330MW |
| Net capacity (design) | 330MW |
| Thermal output | 842MWt |
| NSSS vendor | not on record |
| Typical enrichment | 8–20% U-235, frequently HALEU |
| Site | Fort St. Vrain nuclear power plant |
|---|---|
| Unit | not stated |
| Country | United States |
| Operator | Public Service Company of Colorado |
| Coordinates | 40.2453, -104.8742 |
- BWX Technologies TRISO particle fuel
- X-energy TRISO particle fuel, HALEU enrichment
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
This design needs HALEU, enrichment above 5%. Western production is currently measured in hundreds of kilograms a year.
Timeline
- 1 Sep 1968Construction start
- 31 Jan 1974First criticality
- 11 Dec 1976Grid connection
- 1 Jul 1979Commercial operation
- 29 Aug 1989Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-27
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data