Dounreay nuclear power plant PFR
Dounreay nuclear power plant PFR is a fast reactor unit at Dounreay nuclear power plant in United Kingdom rated at 250 MW gross. It is retired. Commercial operation began 1 Jul 1976.
| Reactor type | Fast reactor (FBR) |
|---|---|
| Model | not disclosed |
| Size | Small300 MWe or less |
| Coolant | Liquid sodium or lead |
| Moderator | None |
| Gross capacity | 250MW |
| Net capacity (reference) | 234MW |
| Net capacity (design) | 234MW |
| Thermal output | 600MWt |
| NSSS vendor | not on record |
| Typical enrichment | 15–20% fissile, or plutonium |
| Site | Dounreay nuclear power plant |
|---|---|
| Unit | PFR |
| Country | United Kingdom |
| Owner | United Kingdom Atomic Energy Authority100% |
| Operator | United Kingdom Atomic Energy Authority |
| Coordinates | 58.5805, -3.7374 |
- TVEL Fuel Company Fast reactor fuel, including MOX
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 Jan 1966Construction start
- 1 Mar 1974First criticality
- 10 Jan 1975Grid connection
- 1 Jul 1976Commercial operation
- 31 Mar 1994Permanent shutdown
Other units at Dounreay nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Dounreay nuclear power plant DFR | Retired | 15 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-17
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data