Chernobyl nuclear power plant 4 is a light water graphite reactor unit at Chernobyl nuclear power plant in Ukraine rated at 1,000 MW gross. It is retired. Commercial operation began 26 Mar 1984.
| Reactor type | Light water graphite reactor (LWGR) |
|---|---|
| Model | RBMK-1000RBMK in the source |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Graphite |
| Gross capacity | 1,000MW |
| Net capacity (reference) | 925MW |
| Net capacity (design) | 925MW |
| Thermal output | 3,200MWt |
| NSSS vendor | Rosatomall vendors |
| Typical enrichment | 2–2.6% U-235 |
| Site | Chernobyl nuclear power plant |
|---|---|
| Unit | 4 |
| Country | Ukraine |
| Owner | SE NNEGC "Energoatom"100% |
| Operator | Mintopenergo Of Ukraine |
| Coordinates | 51.3893, 30.0984 |
- TVEL Fuel Company RBMK fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 Apr 1979Construction start
- 26 Nov 1983First criticality
- 22 Dec 1983Grid connection
- 26 Mar 1984Commercial operation
- 26 Apr 1986Permanent shutdown
Other units at Chernobyl nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Chernobyl nuclear power plant 1 | Retired | 800 |
| Chernobyl nuclear power plant 2 | Retired | 1,000 |
| Chernobyl nuclear power plant 3 | Retired | 1,000 |
| Chernobyl nuclear power plant 5 | Cancelled | 1,000 |
| Chernobyl nuclear power plant 6 | Cancelled | 1,000 |
Other RBMK units
6 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Chernobyl nuclear power plant 1 | Ukraine | Retired | 800 |
| Chernobyl nuclear power plant 2 | Ukraine | Retired | 1,000 |
| Chernobyl nuclear power plant 3 | Ukraine | Retired | 1,000 |
| Chernobyl nuclear power plant 5 | Ukraine | Cancelled | 1,000 |
| Chernobyl nuclear power plant 6 | Ukraine | Cancelled | 1,000 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-09
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data