Beloyarsk nuclear power plant 3

Operating Russia
Gross capacity
600MW

Beloyarsk nuclear power plant 3 is a fast reactor unit at Beloyarsk nuclear power plant in Russia rated at 600 MW gross. It is operating. Commercial operation began 1 Nov 1981.

Specification
Reactor type Fast reactor (FBR)
ModelBN-600
SizeLargeabove 300 MWe
CoolantLiquid sodium or lead
ModeratorNone
Gross capacity600MW
Net capacity (reference)560MW
Net capacity (design)560MW
Thermal output1,470MWt
NSSS vendorRosatomall vendors
Typical enrichment15–20% fissile, or plutonium
Ownership & location
SiteBeloyarsk nuclear power plant
Unit3
CountryRussia
OwnerRosatom100%
OperatorRosenergoatom
Coordinates 56.8417, 61.3225
Fuel chain for this unit
Fuel form
Mixed oxide or metallic fuel
Enrichment
15–20% fissile, or plutonium
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 1969Construction start
  2. 26 Feb 1980First criticality
  3. 8 Apr 1980Grid connection
  4. 1 Nov 1981Commercial operation

Other units at Beloyarsk nuclear power plant