South Ukraine nuclear power plant
South Ukraine nuclear power plant is a nuclear power station in Ukraine with 3 operating units totalling 3,000 MW gross. The site has 5 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | VVER V-302 | 1,000 | 1983 | |
| Unit 2 | PWR | VVER V-338 | 1,000 | 1985 | |
| Unit 3 | PWR | VVER V-320 | 1,000 | 1989 | |
| Unit 4 | Shelved (inferred) | PWR | AP-1000 | 1,250 | - |
| Unit 5 | Shelved (inferred) | PWR | AP-1000 | 1,250 | - |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
South Ukraine nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-302 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 950MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Planned retirement | 2033planned, not actual |
| Owner | SE NNEGC "Energoatom"100% |
| Operator | SE NNEGC "Energoatom" |
| Construction start | 1 Aug 1976 |
|---|---|
| First criticality | 9 Dec 1982 |
| Grid connection | 31 Dec 1982 |
| Commercial operation | 2 Dec 1983 |
South Ukraine nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-338 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 950MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | SE NNEGC "Energoatom"100% |
| Operator | SE NNEGC "Energoatom" |
| Construction start | 1 Jul 1981 |
|---|---|
| First criticality | 30 Dec 1984 |
| Grid connection | 6 Jan 1985 |
| Commercial operation | 6 Apr 1985 |
South Ukraine nuclear power plant 3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-320 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 950MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | SE NNEGC "Energoatom"100% |
| Operator | SE NNEGC "Energoatom" |
| Construction start | 1 Nov 1984 |
|---|---|
| First criticality | 2 Sep 1989 |
| Grid connection | 20 Sep 1989 |
| Commercial operation | 29 Dec 1989 |
South Ukraine nuclear power plant 4 Shelved (inferred)
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | AP-1000 |
| Size class | Large |
| Gross capacity | 1,250MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | SE NNEGC "Energoatom"100% |
| Operator | SE NNEGC "Energoatom" |
| Milestones | no dates on record |
|---|
South Ukraine nuclear power plant 5 Shelved (inferred)
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | AP-1000 |
| Size class | Large |
| Gross capacity | 1,250MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | SE NNEGC "Energoatom"100% |
| Milestones | no dates on record |
|---|
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| VVER (hexagonal) fuel | 3 | TVEL Fuel Company, Westinghouse Electric Company | Enriched |
Ukraine runs 15 operating units on VVER (hexagonal) fuel. 2 fabricators are documented for it. No documented fabricator is based in Ukraine.Country exposure
South Ukraine nuclear power plant in context
By gross operating capacity South Ukraine nuclear power plant is the 2nd largest of 4 operating nuclear sites in Ukraine, holding 22% of the country's operating capacity, and ranks 40th of 172 worldwide.
Its operating units started up between 1983 and 1989; the median unit is 41.0 years old, older than the median of 39.0 in Ukraine.
The 3 units with both construction and grid dates on record took 3.5 to 6.4 years (median 4.9) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.
The nearest other tracked nuclear sites are Zaporizhzhia nuclear power plant (254 km).
The tracker lists a planned retirement year, a forecast and not a decision on record, for 1 operating unit: Unit 1 (2033).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1976 | 1982 | 6.4 | 7.3 (1980s) |
| Unit 2 | 1981 | 1985 | 3.5 | 7.3 (1980s) |
| Unit 3 | 1984 | 1989 | 4.9 | 7.3 (1980s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Zaporizhzhia nuclear power plant | Ukraine | 254 km | 6.0 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of South Ukraine nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Mykolaivska, Ukraine |
|---|---|
| Coordinates | 47.8120, 31.2201 |
| Elevation | about 110 mabove sea level |
| Setting | About 70 km from the sea |
| Region | Eastern Europe |
| Units by status | Operating: 3 Shelved: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | SE NNEGC "Energoatom" |
|---|---|
| Operators | SE NNEGC "Energoatom" |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data