Kudankulam nuclear power plant
Kudankulam nuclear power plant is a nuclear power station in India with 2 operating units totalling 2,000 MW gross. The site has 8 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | VVER V-412 | 1,000 | 2014 | |
| Unit 2 | PWR | VVER V-412 | 1,000 | 2017 | |
| Unit 3 | Under construction | PWR | VVER V-412 | 1,000 | 2027 |
| Unit 4 | Under construction | PWR | VVER V-412 | 1,000 | 2027 |
| Unit 5 | Under construction | PWR | VVER V-412 | 1,000 | 2030 |
| Unit 6 | Under construction | PWR | VVER V-412 | 1,000 | 2030 |
| Unit 7 | Announced | PWR | VVER-1200 | 1,200 | - |
| Unit 8 | Announced | PWR | VVER-1200 | 1,200 | - |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Kudankulam nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-412 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 932MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 31 Mar 2002 |
|---|---|
| First criticality | 13 Jul 2013 |
| Grid connection | 22 Oct 2013 |
| Commercial operation | 31 Dec 2014 |
Kudankulam nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-412 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 932MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 4 Jul 2002 |
|---|---|
| First criticality | 10 Jul 2016 |
| Grid connection | 29 Aug 2016 |
| Commercial operation | 31 Mar 2017 |
Kudankulam nuclear power plant 3 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-412 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 917MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 29 Jun 2017 |
|---|---|
| Commercial operation | 1 Jan 2027 |
Kudankulam nuclear power plant 4 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-412 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 917MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 23 Oct 2017 |
|---|---|
| Commercial operation | 1 Jan 2027 |
Kudankulam nuclear power plant 5 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-412 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 917MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 29 Jun 2021 |
|---|---|
| Commercial operation | 1 Jan 2030 |
Kudankulam nuclear power plant 6 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-412 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 917MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 20 Dec 2021 |
|---|---|
| Commercial operation | 1 Jan 2030 |
Kudankulam nuclear power plant 7 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200 |
| Size class | Large |
| Gross capacity | 1,200MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Milestones | no dates on record |
|---|
Kudankulam nuclear power plant 8 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200 |
| Size class | Large |
| Gross capacity | 1,200MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Milestones | no dates on record |
|---|
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| VVER (hexagonal) fuel | 6 | TVEL Fuel Company, Westinghouse Electric Company | Enriched |
India runs 2 operating units on VVER (hexagonal) fuel. 2 fabricators are documented for it. No documented fabricator is based in India.Country exposure
Kudankulam nuclear power plant in context
By gross operating capacity Kudankulam nuclear power plant is the 1st largest of 7 operating nuclear sites in India, holding 24% of the country's operating capacity, and ranks 89th of 172 worldwide.
Its operating units started up between 2014 and 2017; the median unit is 10.5 years old, younger than the median of 23.5 in India.
The 2 units with both construction and grid dates on record took 11.6 to 14.2 years (median 12.9) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
No other nuclear site with an exact position in this dataset lies within 300 km.
2 operating units are rated differently now from their design net capacities: Unit 1 +1.6% and Unit 2 +1.6%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 2002 | 2013 | 11.6 | 5.9 (2010s) |
| Unit 2 | 2002 | 2016 | 14.2 | 5.9 (2010s) |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Kudankulam nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Tamil Nadu, India |
|---|---|
| Coordinates | 8.1689, 77.7126 |
| Elevation | about 15 mabove sea level |
| Setting | On the sea coast, 0.2 km from the water |
| Region | Southern Asia |
| Units by status | Operating: 2 Under construction: 4 Announced: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Nuclear Power Corporation Of India Ltd |
|---|---|
| Operators | Nuclear Power Corporation Of India |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data