Kakrapar nuclear power plant
Kakrapar nuclear power plant is a nuclear power station in India with 4 operating units totalling 1,840 MW gross. The site has 4 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PHWR | Horizontal Pressure Tube type | 220 | 1993 | |
| Unit 2 | PHWR | Horizontal Pressure Tube type | 220 | 1995 | |
| Unit 3 | PHWR | PHWR-700 | 700 | 2023 | |
| Unit 4 | PHWR | PHWR-700 | 700 | 2024 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Kakrapar nuclear power plant 1
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | Indian PHWR |
| Size class | Small |
| Gross capacity | 220MW |
| Net capacity | 202MW |
| Thermal output | 801MWt |
| Enrichment | Natural uranium, 0.71% U-235no enrichment required |
| NSSS vendor | Nuclear Power Corporation of India |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 1 Dec 1984 |
|---|---|
| First criticality | 3 Sep 1992 |
| Grid connection | 24 Nov 1992 |
| Commercial operation | 6 May 1993 |
Kakrapar nuclear power plant 2
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | Indian PHWR |
| Size class | Small |
| Gross capacity | 220MW |
| Net capacity | 202MW |
| Thermal output | 801MWt |
| Enrichment | Natural uranium, 0.71% U-235no enrichment required |
| NSSS vendor | Nuclear Power Corporation of India |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 1 Apr 1985 |
|---|---|
| First criticality | 8 Jan 1995 |
| Grid connection | 4 Mar 1995 |
| Commercial operation | 1 Sep 1995 |
Kakrapar nuclear power plant 3
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | PHWR-700 |
| Size class | Large |
| Gross capacity | 700MW |
| Net capacity | 630MW |
| Thermal output | 2,166MWt |
| Enrichment | Natural uranium, 0.71% U-235no enrichment required |
| NSSS vendor | Nuclear Power Corporation of India |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 22 Nov 2010 |
|---|---|
| First criticality | 22 Jul 2020 |
| Grid connection | 10 Jan 2021 |
| Commercial operation | 30 Jun 2023 |
Kakrapar nuclear power plant 4
GNPT records the commercial operation date as identical to the grid connection date (2024-02-20), which appears to be a field-copy error. The IAEA records commercial operation on 31 March 2024.
commercial_operation:
2024-02-20 → 2024-03-31
· IAEA Power Reactor Information System, reactor record KAKRAPAR-4
· verified 2026-09-06
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | PHWR-700 |
| Size class | Large |
| Gross capacity | 700MW |
| Net capacity | 630MW |
| Thermal output | 2,166MWt |
| Enrichment | Natural uranium, 0.71% U-235no enrichment required |
| NSSS vendor | Nuclear Power Corporation of India |
| Owner | Nuclear Power Corporation Of India Ltd100% |
| Operator | Nuclear Power Corporation Of India |
| Construction start | 22 Nov 2010 |
|---|---|
| First criticality | 17 Dec 2023 |
| Grid connection | 20 Feb 2024 |
| Commercial operation | 31 Mar 2024 |
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| CANDU / PHWR bundles | 4 | BWX Technologies, Cameco Corporation, China North Nuclear Fuel Company, KEPCO Nuclear Fuel, Nuclear Power Corporation of India | none: natural uranium (conversion then fabrication) |
India runs 19 operating units on CANDU / PHWR bundles. 5 fabricators are documented for it. Nuclear Power Corporation of India is based in India.Country exposure
Kakrapar nuclear power plant in context
By gross operating capacity Kakrapar nuclear power plant is the 2nd largest of 7 operating nuclear sites in India, holding 22% of the country's operating capacity, and ranks 102nd of 172 worldwide.
Its operating units started up between 1993 and 2024; the median unit is 17.0 years old, younger than the median of 23.5 in India.
The 4 units with both construction and grid dates on record took 8.0 to 13.2 years (median 10.0) from construction start to grid connection; the median across all reactors connected in the 2020s is 7.7 years.
The nearest other tracked nuclear sites are Tarapur nuclear power plant (172 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1984 | 1992 | 8.0 | 8.0 (1990s) |
| Unit 2 | 1985 | 1995 | 9.9 | 8.0 (1990s) |
| Unit 3 | 2010 | 2021 | 10.1 | 7.7 (2020s) |
| Unit 4 | 2010 | 2024 | 13.2 | 7.7 (2020s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Tarapur nuclear power plant | India | 172 km | 1.2 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Kakrapar nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Gujarat, India |
|---|---|
| Coordinates | 21.2384, 73.3489 |
| Elevation | about 50 mabove sea level |
| Setting | About 60 km from the sea |
| Region | Southern Asia |
| Units by status | Operating: 4 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Nuclear Power Corporation Of India Ltd |
|---|---|
| Operators | Nuclear Power Corporation Of India |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data