Skip to content

Fessenheim nuclear power plant

Fessenheim nuclear power plant is a nuclear site in France with 2 units on record. None is currently operating.

Operating4Retired7circle area ∝ site capacitydashed = approximate position Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
2
Operating
0
Operating capacity
not disclosed
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1 Retired PWR CP0 920 1978
Unit 2 Retired PWR CP0 920 1978

Fessenheim nuclear power plant in context

The 2 units with both construction and grid dates on record took 5.6 to 5.7 years (median 5.6) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.

The nearest other tracked nuclear sites are Leibstadt nuclear power plant (57 km), Beznau nuclear power plant (63 km) and Goesgen nuclear power plant (67 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1197119775.65.4 (1970s)
Unit 2197219775.75.4 (1970s)

Nearest tracked nuclear sites

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationGrand-Est, France
Coordinates47.9032, 7.5609
Elevationabout 205 mabove sea level
SettingAbout 400 km from the sea
RegionWestern Europe
Units by status
Retired: 2

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Electricité de France SA
Operators
Electricité de France

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.