Skip to content

Combustion Engineering

Combustion Engineering is the nuclear steam supply system vendor for 12 reactor units on record, 7 of them operating, totalling 7.2 GW of gross capacity across 1 country.

Operating units
7
7.2 GW gross
Under construction
1
Planned
0
Retired
4

Designer of the two-loop PWRs at Palisades, Calvert Cliffs, Millstone 2 and elsewhere, and of the System 80 line that became the ancestor of Korea's OPR-1000 and APR-1400. Its nuclear business was sold to ABB in 1990 and passed to Westinghouse in 2000, which supports the installed base today.

Company
HeadquartersWindsor, Connecticut, USA
Foundednot recorded
Ownershipprivate
ParentWestinghouse Electric Company
Roles in the chainvendor
Installed base by country
United States7

Combustion Engineering in context

Combustion Engineering is the reactor vendor for 7 of the 419 operating units on record (1.7%), 11th of 13 vendors by operating units, 7,157 MW gross in total.

The median age of its operating units is 49.0 years, against 39.0 for the whole operating fleet.

Its 11 finished units with construction and grid dates took a median 6.6 years to build, against 6.0 across all finished reactors.

Combustion Engineering is the vendor of 2 reactor design lines (Combustion Engineering 2-loop and System 80), covering 11 units on record, 10 of them operating.

How these are worked out: shares and ranks use the world totals cited in the table, and only named companies are ranked (unnamed or country-level entries in a source are not). A facility with no stated capacity is counted as a facility but adds nothing to a capacity figure. Vendor figures count operating units where this company is the recorded reactor vendor; ages count from the start-up year on record, and build times run from construction start to grid connection, as on the age and build-times pages.

Design lines

DesignGenerationCapacityOperatingUnits
Combustion Engineering 2-loop II 850–1200 MWe gross 7 8
System 80 II 1300–1440 MWe gross 3 3

Installed base

UnitCountryStatusModelGross MWOnline
Waterford nuclear power plant 3 United States Operating CE 2LP (DRYAMB) 1,250 1985
Arkansas Nuclear One nuclear power plant 2 United States Operating CE 2LP (DRYAMB) 1,065 1980
St. Lucie nuclear power plant 2 United States Operating CE 2LP (DRYAMB) 1,050 1983
St. Lucie nuclear power plant 1 United States Operating CE 2LP (DRYAMB) 1,045 1976
Calvert Cliffs nuclear power plant 1 United States Operating CE 2LP (DRYAMB) 918 1975
Millstone nuclear power plant 2 United States Operating CE 2LP (DRYAMB) 918 1975
Calvert Cliffs nuclear power plant 2 United States Operating CE 2LP (DRYAMB) 911 1977
Palisades nuclear power plant Unit 1 Repower United States Under construction CE (2-loop) DRYAMB 800 2026
San Onofre nuclear power plant 2 United States Retired CE (2-loop) DRYAMB 1,127 1983
San Onofre nuclear power plant 3 United States Retired CE (2-loop) DRYAMB 1,127 1984
Palisades nuclear power plant 1 United States Retired CE 2LP (DRYAMB) 850 1971
Fort Calhoun nuclear power plant 1 United States Retired CE 2LP 512 1973

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.