Niederaichbach nuclear power plant 1
Niederaichbach nuclear power plant 1 is a pressurised heavy water reactor unit at Niederaichbach nuclear power plant in Germany rated at 106 MW gross. It is retired. Commercial operation began 1 Jan 1973.
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | pressure tube reactor |
| Size | Small300 MWe or less |
| Coolant | Heavy water |
| Moderator | Heavy water |
| Gross capacity | 106MW |
| Net capacity (reference) | 100MW |
| Net capacity (design) | 100MW |
| Thermal output | 321MWt |
| NSSS vendor | not on record |
| Typical enrichment | Natural uranium, 0.71% U-235 |
| Site | Niederaichbach nuclear power plant |
|---|---|
| Unit | 1 |
| Country | Germany |
| Owner | Karlsruhe Institute For Technology100% |
| Operator | Kernkraftwerk Niederaichbach |
| Coordinates | 48.6047, 12.3039 |
- BWX Technologies CANDU fuel bundles, natural uranium
- Cameco Corporation CANDU fuel bundles, natural uranium
- China North Nuclear Fuel Company CANDU fuel bundles
- KEPCO Nuclear Fuel CANDU fuel bundles
- Nuclear Power Corporation of India PHWR fuel bundles, natural uranium
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Timeline
- 1 Jun 1966Construction start
- 1 Jan 1973Commercial operation
- 31 Jul 1974Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-14
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data