Mahi Banswara nuclear power plant 2-4
Mahi Banswara nuclear power plant 2-4 is a pressurised heavy water reactor unit at Mahi Banswara nuclear power plant in India rated at 700 MW gross. It is pre-construction. Commercial operation began 1 Jan 2029.
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | PHWR-700 |
| Size | Largeabove 300 MWe |
| Coolant | Heavy water |
| Moderator | Heavy water |
| Gross capacity | 700MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| NSSS vendor | Nuclear Power Corporation of Indiaall vendors |
| Typical enrichment | Natural uranium, 0.71% U-235 |
| Site | Mahi Banswara nuclear power plant |
|---|---|
| Unit | 2-4 |
| Country | India |
| Owner | Nuclear Power Corporation of India LTD (NPCIL)51% NTPC Ltd49% |
| Operator | Anushakti Vidhyut Nigam Ltd |
| Coordinates | 23.5294, 74.5906 |
- BWX Technologies CANDU fuel bundles, natural uranium
- Cameco Corporation CANDU fuel bundles, natural uranium
- China North Nuclear Fuel Company CANDU fuel bundles
- KEPCO Nuclear Fuel CANDU fuel bundles
- Nuclear Power Corporation of India PHWR fuel bundles, natural uranium
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Timeline
- 1 Jan 2024Construction start
- 1 Jan 2029Commercial operation
Other units at Mahi Banswara nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Mahi Banswara nuclear power plant 1-1 | Pre-construction | 700 |
| Mahi Banswara nuclear power plant 1-2 | Pre-construction | 700 |
| Mahi Banswara nuclear power plant 2-3 | Pre-construction | 700 |
Other PHWR-700 units
16 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Kakrapar nuclear power plant 3 | India | 700 | |
| Kakrapar nuclear power plant 4 | India | 700 | |
| Bhimpur nuclear power plant 1 | India | Cancelled | 700 |
| Bhimpur nuclear power plant 2 | India | Cancelled | 700 |
| Bhimpur nuclear power plant 3 | India | Cancelled | 700 |
| Bhimpur nuclear power plant 4 | India | Cancelled | 700 |
| Chutka nuclear power plant 1 | India | Pre-construction | 700 |
| Chutka nuclear power plant 2 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 1-1 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 1-2 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 2-3 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 2-4 | India | Pre-construction | 700 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-06-18
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data