Hunterston nuclear power plant B2
Retired United Kingdom
Gross capacity
644MW
Hunterston nuclear power plant B2 is a gas-cooled reactor unit at Hunterston nuclear power plant in United Kingdom rated at 644 MW gross. It is retired. Commercial operation began 1 Apr 1977.
Specification
| Reactor type | Gas-cooled reactor (GCR) |
|---|---|
| Model | AGR |
| Size class | Large |
| Coolant | Carbon dioxide |
| Moderator | Graphite |
| Gross capacity | 644MW |
| Net capacity (reference) | 495MW |
| Net capacity (design) | 624MW |
| Thermal output | 1,496MWt |
| Typical enrichment | Natural uranium to 2.5–3.5% U-235 |
Ownership & location
| Site | Hunterston nuclear power plant |
|---|---|
| Unit | B2 |
| Country | United Kingdom |
| Owner | EDF Energy Ltd100% |
| Operator | EDF Energy |
| Coordinates | 55.7229, -4.8913 |
Fuel chain for this unit
Fuel form
Uranium metal (Magnox) or uranium dioxide (AGR)
Enrichment
Natural uranium to 2.5–3.5% U-235 no enrichment required
Who makes this assembly
- Westinghouse Electric Company AGR fuel elements
Upstream
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 1 Nov 1967Construction start
- 27 Mar 1977First criticality
- 31 Mar 1977Grid connection
- 1 Apr 1977Commercial operation
- 7 Jan 2022Permanent shutdown
Other units at Hunterston nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Hunterston nuclear power plant A1 | Retired | 173 |
| Hunterston nuclear power plant A2 | Retired | 173 |
| Hunterston nuclear power plant B1 | Retired | 644 |
Other AGR units
15 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Hartlepool nuclear power plant A1 | United Kingdom | 655 | |
| Hartlepool nuclear power plant A2 | United Kingdom | 655 | |
| Heysham nuclear power plant A1 | United Kingdom | 625 | |
| Heysham nuclear power plant A2 | United Kingdom | 625 | |
| Heysham nuclear power plant B1 | United Kingdom | 680 | |
| Heysham nuclear power plant B2 | United Kingdom | 680 | |
| Torness nuclear power plant 1 | United Kingdom | 682 | |
| Torness nuclear power plant 2 | United Kingdom | 682 | |
| Dungeness nuclear power plant B1 | United Kingdom | Retired | 615 |
| Dungeness nuclear power plant B2 | United Kingdom | Retired | 615 |
| Hinkley Point nuclear power plant B1 | United Kingdom | Retired | 655 |
| Hinkley Point nuclear power plant B2 | United Kingdom | Retired | 655 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-17
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted