Tokai nuclear power plant

Tokai nuclear power plant is a nuclear site in Japan with 2 units on record. None is currently operating.

Operating1Mothballed1Retired3circle area ∝ site capacitydashed = approximate position Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
2
Operating
0
Operating capacity
not disclosed
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1 Retired GCR MAGNOX 166 1966
Unit 2 Mothballed BWR BWR-5 1,100 1978

Tokai nuclear power plant in context

The one unit with both construction and grid dates on record took 4.7 years from construction start to grid connection; the median across all reactors connected in the 1960s is 5.0 years.

The nearest other tracked nuclear sites are Kashiwazaki Kariwa nuclear power plant (211 km) and Onagawa nuclear power plant (234 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1196119654.75.0 (1960s)

Nearest tracked nuclear sites

SiteCountryDistanceOperating GW gross
Kashiwazaki Kariwa nuclear power plantJapan211 km1.4
Onagawa nuclear power plantJapan234 km0.8

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationHitachinaka, Ibaraki, Japan
Coordinates36.4215, 140.6028
Elevationabout 5 mabove sea level
SettingOn the sea coast, 0.7 km from the water
RegionEastern Asia
Units by status
Retired: 1
Mothballed: 1

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Japan Atomic Power Co
Operators
Japan Atomic Power

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try