Skip to content

Arihant class

submarine · SSBN India Operating
Fuel enrichment
40% U-235
HEU

Arihant class is a nuclear-powered submarine operated by Indian Navy, powered by Indian PWR of about 83 MWt. Operating.

India's indigenous ballistic missile submarine, launched 2009 and commissioned 2016. Thirteen fuel assemblies of 348 rods each, at 40% enrichment, another point on the spectrum between the French and American approaches.

Propulsion
ReactorIndian PWR
Reactors per vessel1
Thermal output83MWt
Fuel enrichment40% U-235HEU
Refuellingnot disclosed
Vessel
Categorysubmarine
RoleSSBN
OperatorIndian Navy
CountryIndia
Vessels in classnot stated
In service from2016
StatusOperating

Other submarines

ClassEnrichmentStatus
AUKUS submarines HEU Planned
Akula class - Operating
Alfa class HEU Retired
Astute class HEU Operating
Borei class HALEU Operating
Columbia class HEU Under construction
Dreadnought class HEU Under construction
Han class (Type 091) - Operating
Le Triomphant class LEU Operating
Los Angeles class HEU Operating
Ohio class HEU Operating
Oscar II class - Operating
Seawolf class HEU Operating
Suffren class (Barracuda) LEU Operating
Type 093 and 094 (Shang and Jin) LEU Operating
Typhoon class - Retired
USS Nautilus HEU Retired
Vanguard class - Operating
Virginia class HEU Operating
Xia class (Type 092) - Retired
Yasen class HALEU Operating

Arihant class in context

It is one of 22 submarine programs on record, 15 of them operating and 4 retired.

Each of its reactors is rated about 83 MWt; across the 19 submarine programs with a stated rating the median is 165 MWt, and this one ranks 16th.

Its fuel is recorded as HEU, the same as 10 of the other 15 submarine programs with a stated enrichment class.

It entered service in 2016, 10 years ago; the submarine programs on record entered service between 1955 and 2020, and this one is the 16th earliest of 17.

MeasureArihant classMedian of submarine programsStanding
Thermal power per reactor (MWt)8316516 of 19
Entered service2016199716 of 17 (earliest first)

Worked out from the entries on this site only, so a figure compares Arihant class with what is recorded here, not with everything that exists. An entry with no value for a measure is left out of that measure's ranking and median.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.