Skip to content

Nuclear power in Argentina

Argentina operates 3 nuclear power reactors across 3 sites, with 1.8 GW of gross capacity.

Operating
3
1.8 GW gross
Under construction
0
-
Planned
4
incl. 4 announced
Retired
0
0 cancelled
Operating2Shelved1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.

Operating fleet by type: PHWR (3). Principal operator: Nucleoelectrica Argentina.

In 2025 Demian Reidel, head of the Consejo Nuclear Argentino, said the national nuclear plan would start with four ACR-300 small modular reactors at Atucha, with the first targeted for 2030. Work on the CAREM prototype was halted in September 2024 amid budget cuts. Policy position as read on 2026-11-07: World Nuclear Association, Nuclear Power in Argentina (page dated 2026-10-23); NA-SA: Conmemoracion por los 75 anos de la CNEA (page dated 2025-05-30).

Operating capacity over time

First reactor online1974
Peak1.8 GW in 2016
Now1.8 GW 3 units
2026 so farno change
00.511.5219801990200020102020GW
Gross capacity of units that had started up and not been permanently shut down by 31 December each year (2026 is to date). Amber marks the peak, green the present.
Data table
YearUnits onlineGW grossChange, GW
197410.36+0.36
198421.02+0.66
201631.76+0.75

Only years in which capacity changed are listed.

How Argentina compares

Concentration
63% of Argentina's operating capacity is at Atucha, the largest of its 2 sites. AtkinsRéalis supplied 100% of the capacity with a vendor on record. The comparison page ranks only fleets of four or more units.
Replacement
0.4 GW (1 unit) would pass 60 years by 2040 if kept running, against nothing under construction.
Fuel at home
Argentina's reactors need roughly 220 tonnes of uranium a year, none of it mined at home. It has fabrication at home.
Earthquakes
None of the 2 operating sites had an M5+ earthquake within 100 km between 1975 and 2025.

Each heading links to the page that ranks every country on the same measure.

Position in the fuel chain

FacilityStageOperatorCapacity / output
Pilcaniyeu enrichment Comisión Nacional de Energía Atómica not disclosed
Ezeiza and Córdoba (Conuar) fabrication Conuar 200tHM/yr

All units in Argentina

Fuel supply exposure

The fuel families Argentina's operating reactors take, and the fabricators our sources document as able to make each. This is capability, not contracts: it does not say who actually supplies a given plant.

Fuel familyUnitsGW grossDocumented fabricatorsNote
CANDU / PHWR bundles31.8Cameco Corporation, BWX Technologies, Nuclear Power Corporation of India, KEPCO Nuclear Fuel, China North Nuclear Fuel Company

See every country and who fabricates fuel.

Put this country on your own page: embed a card, or compare it with another country.

Follow Argentina: Atom feed of large earthquakes near Argentina plants. Outage changes are only tracked for a few countries; see the alerts page.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.