Nuclear power in Argentina
nuclearchain.net/countries/argentina/ · data: Global Energy Monitor (GNPT, August 2026), CC BY 4.0 · printed from the live page
Argentina operates 3 nuclear power reactors across 3 sites, with 1.8 GW of gross capacity.
Operating fleet by type: PHWR (3). Principal operator: Nucleoelectrica Argentina.
In 2025 Demian Reidel, head of the Consejo Nuclear Argentino, said the national nuclear plan would start with four ACR-300 small modular reactors at Atucha, with the first targeted for 2030. Work on the CAREM prototype was halted in September 2024 amid budget cuts. Policy position as read on 2026-11-07: World Nuclear Association, Nuclear Power in Argentina (page dated 2026-10-23); NA-SA: Conmemoracion por los 75 anos de la CNEA (page dated 2025-05-30).
Operating capacity over time
Data table
| Year | Units online | GW gross | Change, GW |
|---|---|---|---|
| 1974 | 1 | 0.36 | +0.36 |
| 1984 | 2 | 1.02 | +0.66 |
| 2016 | 3 | 1.76 | +0.75 |
Only years in which capacity changed are listed.
How Argentina compares
- Concentration
- 63% of Argentina's operating capacity is at Atucha, the largest of its 2 sites. AtkinsRéalis supplied 100% of the capacity with a vendor on record. The comparison page ranks only fleets of four or more units.
- Replacement
- 0.4 GW (1 unit) would pass 60 years by 2040 if kept running, against nothing under construction.
- Fuel at home
- Argentina's reactors need roughly 220 tonnes of uranium a year, none of it mined at home. It has fabrication at home.
- Earthquakes
- None of the 2 operating sites had an M5+ earthquake within 100 km between 1975 and 2025.
Each heading links to the page that ranks every country on the same measure.
Position in the fuel chain
| Facility | Stage | Operator | Capacity / output |
|---|---|---|---|
| Pilcaniyeu | enrichment | Comisión Nacional de Energía Atómica | not disclosed |
| Ezeiza and Córdoba (Conuar) | fabrication | Conuar | 200tHM/yr |
All units in Argentina
| Unit | Site | Status | Type | Gross MW | Online |
|---|---|---|---|---|---|
| Atucha nuclear power plant 1 | Atucha nuclear power plant | PHWR | 362 | 1974 | |
| Atucha nuclear power plant 2 | Atucha nuclear power plant | PHWR | 745 | 2016 | |
| Embalse nuclear power plant | Embalse nuclear power plant | PHWR | 656 | 1984 | |
| Atucha nuclear power plant SMR 1 | Atucha nuclear power plant | Announced | - | 300 | 2030 |
| Atucha nuclear power plant SMR 2 | Atucha nuclear power plant | Announced | - | 300 | - |
| Atucha nuclear power plant SMR 3 | Atucha nuclear power plant | Announced | - | 300 | - |
| Atucha nuclear power plant SMR 4 | Atucha nuclear power plant | Announced | - | 300 | - |
| Atucha nuclear power plant 3 | Atucha nuclear power plant | Shelved | PWR | 1,150 | - |
| CAREM nuclear power plant | CAREM nuclear power plant | Shelved | PWR | 29 | - |
Fuel supply exposure
The fuel families Argentina's operating reactors take, and the fabricators our sources document as able to make each. This is capability, not contracts: it does not say who actually supplies a given plant.
| Fuel family | Units | GW gross | Documented fabricators | Note |
|---|---|---|---|---|
| CANDU / PHWR bundles | 3 | 1.8 | Cameco Corporation, BWX Technologies, Nuclear Power Corporation of India, KEPCO Nuclear Fuel, China North Nuclear Fuel Company |
See every country and who fabricates fuel.
Put this country on your own page: embed a card, or compare it with another country.
Follow Argentina: Atom feed of large earthquakes near Argentina plants. Outage changes are only tracked for a few countries; see the alerts page.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- Nuclear share of electricity: Our World in Data, from Ember and the Energy Institute , CC BY 4.0 · retrieved 2026-10-28
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data