29MWe

CAREM-25 is a light water-cooled reactor design from Comisión Nacional de Energía Atómica rated at 29 MWe. Nuclear construction has begun.

First concrete in 2014, which makes it one of the earliest SMR construction starts anywhere, and it is still not finished. Work has been suspended more than once, including a two-year halt from November 2019, and is suspended again. Argentina designed an integral PWR with natural circulation and no primary pumps before most of the current SMR industry existed, and the record here is a caution about reading a construction start as progress.

Regulatory position
Tier Under construction
RegulatorAutoridad Regulatoria Nuclear (Argentina)
Application typeConstruction licence
Docket / referenceARN construction licence, Formosa site at Lima, Buenos Aires province
Application date-
Review phaseLicensed and under construction since 2014; work currently suspended
Decision expectednot stated
Design
CoolantLight water
Reactor familyPressurised water reactor (PWR)
Electrical output29MWe
Thermal outputnot disclosed
FuelUranium dioxide
Enrichment LEUAround 3.1% U-235
First siteCAREM
Offtakersnone announced

Units announced with this design

1 unit in the Global Nuclear Power Tracker carry the model name "CAREM Prototype (Integrated-PWR)", 1shelved. Announcement is not permission; compare this against the regulatory position above.

UnitCountryStatusGross MW
CAREM nuclear power plant Argentina shelved 29

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data