Kaleidos

Pre-application HALEU dependency
Output
1MWe

Kaleidos is a helium-cooled reactor design rated at 1 MWe. The developer is engaging a regulator but has not submitted an application. It requires HALEU fuel.

What would have to be true

Radiant would need to enter NRC licensing to sell power commercially — a DOE demonstration on a national laboratory site is not a commercial licence. It would also need a HALEU TRISO supply that does not yet exist at volume. The engineering claim is credible; the schedule depends almost entirely on fuel.

Designed from the outset to fit a standard shipping container, sized to replace diesel generators at remote sites, disaster areas and military bases. At 1.2 MWe it is roughly a thousandth of a large reactor — the point is not scale but transportability and the fact that diesel is the incumbent it has to beat, not grid power.

Regulatory position
Tier Pre-application
RegulatorUS Department of Energy authorisation pathway
Application typeDOE demonstration at the National Reactor Innovation Center
Docket / referenceDOE demonstration agreement, National Reactor Innovation Center, Idaho National Laboratory
Application date
Review phaseFuelled demonstration planned at a DOE site; no NRC licence application
Decision expectednot stated
Design
CoolantHelium
Reactor familyHigh-temperature gas reactor (HTGR)
Electrical output1MWe
Thermal outputnot disclosed
FuelTRISO
Enrichment HALEUUp to 19.75% U-235
First siteIdaho National Laboratory
Offtakersnone announced
Fuel supply for this design

This design needs HALEU — uranium enriched above 5% and below 20%. That is not the fuel any commercial Western power reactor uses today, and it is the single most common reason an advanced reactor timeline slips. Every Western facility that can make it or turn it into fuel:

FacilityCapacityStatus
TRISO-X Fuel Facility (TX-1), Oak Ridge not disclosed construction
American Centrifuge Plant, Piketon 900kg HALEU/yr operating
Nuclear Fuel Services, Erwin not disclosed operating
Savannah River Site HEU downblending 3,100kg HALEU total operating
BWXT TRISO facility, Gillette not disclosed planned
Urenco Capenhurst HALEU line not disclosed planned