Skip to content
nuclearchain

IMSR (Integral Molten Salt Reactor)

Pre-application HALEU dependency
Output
195MWe

IMSR (Integral Molten Salt Reactor) is a molten fluoride salt-cooled reactor design rated at 195 MWe. The developer is engaging a regulator but has not submitted an application. It requires HALEU fuel.

What would have to be true

Terrestrial Energy would need to file a construction permit application, and a first-of-a-kind molten salt reactor would need to demonstrate that its corrosion and fuel-salt chemistry behave over years, not months. No commercial MSR has ever operated.

Approved topical reports are real regulatory progress and are often reported as if they were approval of the reactor. They are not: they settle methodology questions in advance of an application that has not yet been made.

Regulatory position
Tier Pre-application
RegulatorUS NRC and CNSC (Canada)
Application typeTopical reports; pre-application
Docket / referenceNRC approved IMSR Principal Design Criteria topical report (2025) and Postulated Initiating Event methodology (2026)
Application date
Review phaseTopical reports approved; no licence application submitted
Decision expectednot stated
Design
CoolantMolten fluoride salt
Reactor familyMolten salt reactor (MSR)
Electrical output195MWe
Thermal outputnot disclosed
FuelUranium fuel dissolved in salt
Enrichment HALEU
First sitenone announced
Offtakersnone announced
Fuel supply for this design

This design needs HALEU — uranium enriched above 5% and below 20%. That is not the fuel any commercial Western power reactor uses today, and it is the single most common reason an advanced reactor timeline slips. Every Western facility that can make it or turn it into fuel:

FacilityCapacityStatus
TRISO-X Fuel Facility (TX-1), Oak Ridge not disclosed construction
American Centrifuge Plant, Piketon 900kg HALEU/yr operating
Nuclear Fuel Services, Erwin not disclosed operating
Savannah River Site HEU downblending 3,100kg HALEU total operating
BWXT TRISO facility, Gillette not disclosed planned
Urenco Capenhurst HALEU line not disclosed planned

Sources