BWRX-300
BWRX-300 is a light water-cooled reactor design from GE Vernova Hitachi Nuclear Energy rated at 300 MWe. Nuclear construction has begun.
The first SMR construction start in a G7 country. A simplification of the licensed ESBWR using natural circulation instead of recirculation pumps, allowing it to be licensed faster than a clean-sheet design. Crucially it runs on **conventional LEU**, so unlike most of this list it does not wait on HALEU.
| Tier | Under construction |
|---|---|
| Regulator | CNSC (Canada) and US NRC |
| Application type | Licence to construct (Canada); construction permit (USA) |
| Docket / reference | CNSC licence to construct, Darlington New Nuclear Project; NRC construction permit application, Clinch River (TVA) |
| Application date | - |
| Review phase | Under construction at Darlington; TVA application under NRC review |
| Decision expected | not stated |
| Coolant | Light water |
|---|---|
| Reactor family | Boiling water reactor (BWR) |
| Electrical output | 300MWe |
| Thermal output | not disclosed |
| Fuel | Uranium dioxide |
| Enrichment | LEUUnder 5% U-235 |
| First site | Darlington, Ontario |
| Offtakers | Ontario Power Generation; Tennessee Valley Authority |
Units announced with this design
47 units in the Global Nuclear Power Tracker carry the model name "BWRX-300", 1construction, 35announced, 11pre construction. Announcement is not permission; compare this against the regulatory position above.
Showing 40 of 47.
Sources
- US Department of Energy and GE Vernova · retrieved 2026-09-06
- Announced units: Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data