Skip to content
nuclearchain

Saint-Laurent nuclear power plant A-2

Retired France
Gross capacity
530MW

Saint-Laurent nuclear power plant A-2 is a gas-cooled reactor unit at Saint-Laurent nuclear power plant in France rated at 530 MW gross. It is retired. Commercial operation began 1 Nov 1971.

Specification
Reactor type Gas-cooled reactor (GCR)
ModelUranium Naturel Graphite Gaz
Size classLarge
CoolantCarbon dioxide
ModeratorGraphite
Gross capacity530MW
Net capacity (reference)465MW
Net capacity (design)515MW
Thermal output1,475MWt
Typical enrichmentNatural uranium to 2.5–3.5% U-235
Ownership & location
SiteSaint-Laurent nuclear power plant
UnitA-2
CountryFrance
OwnerElectricité de France SA100%
OperatorElectricité de France
Coordinates 47.7197, 1.5783
Fuel chain for this unit
Fuel form
Uranium metal (Magnox) or uranium dioxide (AGR)
Enrichment
Natural uranium to 2.5–3.5% U-235 no enrichment required
Upstream

This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversionfabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 1966Construction start
  2. 4 Jul 1971First criticality
  3. 9 Aug 1971Grid connection
  4. 1 Nov 1971Commercial operation
  5. 27 May 1992Permanent shutdown

Other units at Saint-Laurent nuclear power plant

Other Uranium Naturel Graphite Gaz units

6 units worldwide share this model designation.

UnitCountryStatusGross MW
Bugey nuclear power plant 1 France Retired 555
Chinon nuclear power plant A-1 France Retired 80
Chinon nuclear power plant A-2 France Retired 230
Chinon nuclear power plant A-3 France Retired 480
Saint-Laurent nuclear power plant A-1 France Retired 500

Sources