Project Pele nuclear power plant
Project Pele nuclear power plant is a gas-cooled reactor unit at Project Pele nuclear power plant in United States rated at 2 MW gross. It is under construction. Commercial operation began 1 Jan 2028.
| Reactor type | Gas-cooled reactor (GCR) |
|---|---|
| Model | not disclosed |
| Size | Very small20 MWe or less |
| Coolant | Carbon dioxide |
| Moderator | Graphite |
| Gross capacity | 2MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| NSSS vendor | not on record |
| Typical enrichment | Natural uranium to 2.5–3.5% U-235 |
| Site | Project Pele nuclear power plant |
|---|---|
| Unit | not stated |
| Country | United States |
| Owner | US Department of Defense100% |
| Coordinates | 43.5195, -112.0460approximate |
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Timeline
- 1 Jan 2028Commercial operation
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-06-29
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data