Pickering nuclear power plant A1
Pickering nuclear power plant A1 is a pressurised heavy water reactor unit at Pickering nuclear power plant in Canada rated at 542 MW gross. It is retired. Commercial operation began 29 Jul 1971.
Permanently shut down on 1 October 2024 ahead of the Pickering B refurbishment programme, after the GNPT record was last researched in May 2024.
status:
operating → retired
· IAEA Power Reactor Information System, reactor record PICKERING-1
· verified 2026-09-06
Permanently shut down on 1 October 2024 ahead of the Pickering B refurbishment programme, after the GNPT record was last researched in May 2024.
permanent_shutdown:
not set → 2024-10-01
· IAEA Power Reactor Information System, reactor record PICKERING-1
· verified 2026-09-06
Permanently shut down on 1 October 2024 ahead of the Pickering B refurbishment programme, after the GNPT record was last researched in May 2024.
retirement_year:
not set → 2024
· IAEA Power Reactor Information System, reactor record PICKERING-1
· verified 2026-09-06
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | CANDU 500A |
| Size class | Large |
| Coolant | Heavy water |
| Moderator | Heavy water |
| Gross capacity | 542MW |
| Net capacity (reference) | 515MW |
| Net capacity (design) | 508MW |
| Thermal output | 1,744MWt |
| Typical enrichment | Natural uranium, 0.71% U-235 |
| Site | Pickering nuclear power plant |
|---|---|
| Unit | A1 |
| Country | Canada |
| Owner | Ontario Power Generation Inc100% |
| Operator | Ontario Power Generation |
| Coordinates | 43.8107, -79.0689 |
- BWX Technologies CANDU fuel bundles, natural uranium
- Cameco Corporation CANDU fuel bundles, natural uranium
- China North Nuclear Fuel Company CANDU fuel bundles
- KEPCO Nuclear Fuel CANDU fuel bundles
- Nuclear Power Corporation of India PHWR fuel bundles, natural uranium
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Timeline
- 1 Jun 1966Construction start
- 25 Feb 1971First criticality
- 4 Apr 1971Grid connection
- 29 Jul 1971Commercial operation
- 1 Oct 2024Permanent shutdown
Other units at Pickering nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Pickering nuclear power plant A2 | Retired | 542 |
| Pickering nuclear power plant A3 | Retired | 542 |
| Pickering nuclear power plant A4 | Retired | 542 |
| Pickering nuclear power plant B5 | 540 | |
| Pickering nuclear power plant B6 | 540 | |
| Pickering nuclear power plant B7 | 540 | |
| Pickering nuclear power plant B8 | 540 |
Other CANDU 500A units
4 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Pickering nuclear power plant A2 | Canada | Retired | 542 |
| Pickering nuclear power plant A3 | Canada | Retired | 542 |
| Pickering nuclear power plant A4 | Canada | Retired | 542 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-09
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted