Fugen nuclear power plant
Fugen nuclear power plant is a pressurised heavy water reactor unit at Fugen nuclear power plant in Japan rated at 165 MW gross. It is retired. Commercial operation began 20 Mar 1979.
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | ATR |
| Size | Small300 MWe or less |
| Coolant | Heavy water |
| Moderator | Heavy water |
| Gross capacity | 165MW |
| Net capacity (reference) | 148MW |
| Net capacity (design) | 148MW |
| Thermal output | 557MWt |
| NSSS vendor | not on record |
| Typical enrichment | Natural uranium, 0.71% U-235 |
| Site | Fugen nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Japan |
| Owner | Japan Atomic Energy Agency100% |
| Operator | Japan Atomic Energy Agency |
| Coordinates | 35.7544, 136.0191 |
- BWX Technologies CANDU fuel bundles, natural uranium
- Cameco Corporation CANDU fuel bundles, natural uranium
- China North Nuclear Fuel Company CANDU fuel bundles
- KEPCO Nuclear Fuel CANDU fuel bundles
- Nuclear Power Corporation of India PHWR fuel bundles, natural uranium
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Timeline
- 10 May 1972Construction start
- 20 Mar 1978First criticality
- 29 Jul 1978Grid connection
- 20 Mar 1979Commercial operation
- 29 Mar 2003Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-16
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data