Douglas Point (AECL) nuclear power plant is a pressurised heavy water reactor unit at Douglas Point (AECL) nuclear power plant in Canada rated at 218 MW gross. It is retired. Commercial operation began 26 Sep 1968.
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | CANDU 200 |
| Size | Small300 MWe or less |
| Coolant | Heavy water |
| Moderator | Heavy water |
| Gross capacity | 218MW |
| Net capacity (reference) | 206MW |
| Net capacity (design) | 203MW |
| Thermal output | 704MWt |
| NSSS vendor | AtkinsRéalis (Candu Energy)all vendors |
| Typical enrichment | Natural uranium, 0.71% U-235 |
| Site | Douglas Point (AECL) nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Canada |
| Owner | Atomic Energy Of Canada Ltd100% |
| Operator | Ontario Hydro |
| Coordinates | 44.3265, -81.6006 |
- BWX Technologies CANDU fuel bundles, natural uranium
- Cameco Corporation CANDU fuel bundles, natural uranium
- China North Nuclear Fuel Company CANDU fuel bundles
- KEPCO Nuclear Fuel CANDU fuel bundles
- Nuclear Power Corporation of India PHWR fuel bundles, natural uranium
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Timeline
- 1 Feb 1960Construction start
- 15 Nov 1966First criticality
- 7 Jan 1967Grid connection
- 26 Sep 1968Commercial operation
- 4 May 1984Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-08
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data