Davis-Besse vessel head corrosion

United States power reactor
INES level
3
Serious incident

Nothing happened, and that is why it matters. Corrosion had eaten a football-sized hole through a reactor vessel head, leaving a 6 mm stainless liner as the only barrier — discovered by chance.

The event
Date2002-03-06
INES rating3 Serious incident
Facilitypower reactor
UnitDavis Besse nuclear power plant 1
Reactor typePressurised water reactor (PWR)
CountryUnited States
Casualties
Deaths at the time0
Acute radiation deathsnot established

No deaths, injuries or release. This is a near-miss, included because of what it revealed.

Cause

Boric acid leaking from a cracked nozzle ate a cavity through the carbon steel reactor vessel head over years, leaving only the thin stainless steel liner holding the pressure.

What happened

Boric acid in the coolant leaked from cracked control rod drive nozzles and, over several years, corroded away the carbon steel of the reactor pressure vessel head. Inspectors eventually found a cavity roughly the size of a football.

What remained holding back a reactor coolant system at 155 bar was the vessel's stainless steel cladding, about 6 mm thick, already visibly bulging.

Consequences

The plant was shut for two years. The operator was fined and later pleaded guilty to concealing information from the regulator, having deferred inspections that would have found the damage.

What changed afterwards

Davis-Besse is the industry's reference case for normalisation of deviance: boric acid deposits had been seen and recorded repeatedly and treated as a housekeeping nuisance rather than as evidence of an active leak.

It changed inspection requirements for vessel heads across the US fleet and is taught as a regulatory failure as much as an engineering one — the NRC had accepted the operator's case for delaying an inspection.

Other accidents

AccidentINESDate
Chernobyl 7 1986-04-26
Fukushima Daiichi 7 2011-03-11
Kyshtym (Mayak) 6 1957-09-29
Windscale Pile 1 fire 5 1957-10-10
Three Mile Island Unit 2 5 1979-03-28
SL-1 4 1961-01-03
Saint-Laurent A2 fuel melt 4 1980-03-13
Tokaimura criticality accident 4 1999-09-30
Vandellòs I turbine fire 3 1989-10-19

Sources