  "slug": "nuward",
  "name": "Nuward",
  "company_id": "edf",
  "coolant": "Light water",
  "reactor_type": "pwr",
  "output_mwe": 400,
  "thermal_mw": null,
  "fuel_type": "Uranium dioxide",
  "enrichment_class": "LEU",
  "enrichment_pct": "Under 5% U-235",
  "regulator": "ASNR (France), with a joint review by six European regulators",
  "application_type": "Pre-licensing safety options review",
  "application_date": null,
  "review_phase": "Third phase of the joint European safety options review; conceptual design being redone",
  "decision_expected": null,
  "credibility_tier": "pre_application",
  "docket": "ASNR safety options review, with a joint European early review at phase three",
  "first_site_name": null,
  "first_site_country": "FRA",
  "offtakers": null,
  "model_match": null,
  "transportable": 0,
  "form_factor": "Originally two 170 MWe integral modules; redesigned in 2025 around conventional technology",
  "what_if": null,
  "notes": "Europe's flagship SMR, and a case of a design being restarted rather than advanced. EDF abandoned the original integral concept in 2024 after customer feedback, moving to what it called existing and proven technology, and the output changed from two 170 MWe modules to a single 400 MW unit. Conceptual design was due to be finalised by mid-2026 for a product marketed in the 2030s. EDF also withdrew from the British SMR competition.\n",
  "source_name": "World Nuclear News, EDF simplifies Nuward SMR design",
  "source_url": "https://world-nuclear-news.org/articles/edf-simplifies-nuward-smr-design",
  "url": "https://nuclearchain.net/smr/nuward/",
  "license": "CC BY 4.0",
  "attribution": "NuclearChain (nuclearchain.net)"
}